Ola Williams Family Home

Construction Schedule

There are no builds

Construction Checklist

Note: The list below is grouped into expected completion date.

Date has not been set


Build Floor Beam
Clean Up
Foam Exterior Walls
Frame Exterior Walls
Frame Interior Walls
Frame Porch
Install Appliances
Install Blocking for Cabinets, Grab-bars
Install Closet Shelving
Install Crawlspace Vapor Barrier
Install Doors
Install Drip Edge
Install Drywall Backing
Install Electrical
Install Floor Decking
Install Floor System
Install HVAC
Install Interior Doors & Knobs
Install Interior Trim
Install Kitchen & Bath Cabinets
Install Plumbing
Install Porch Rail & Lattice
Install Roof Felt
Install Roof Sheathing
Install Roof Shingles
Install Siding
Install Siding Starter Strips
Install Soffitt
Install Termite Shield, Sill Sealer, Sill Plate
Install Truss Clips
Install Windows
Insulate Crawlspace
Landscaping
Line & Brace Exterior Walls
Line & Brace Interior Walls
Paint Interior Doors
Paint Interior Trim
Paint Interior Walls
Prime Interior Walls
Set Roof Trusses
Sheath Exterior Walls
Spread Pea Gravel
Touch Up Painting
Trim Doors
Trim Windows