Coleman Family Home

Construction Schedule

There are no builds

Construction Checklist

Note: The list below is grouped into expected completion date.

Date has not been set

Build Floor Beam
Clean Up
Foam Exterior Walls
Frame Exterior Walls
Install Blocking for Cabinets, Grab-bars
Install Crawlspace Vapor Barrier
Install Drip Edge
Install Drywall Backing
Install Floor System
Install Interior Trim
Install Kitchen & Bath Cabinets
Install Plumbing
Install Roof Felt
Install Roof Sheathing
Install Siding
Insulate Crawlspace
Line & Brace Exterior Walls
Line & Brace Interior Walls
Paint Interior Doors
Paint Interior Walls
Set Roof Trusses
Sheath Exterior Walls
Touch Up Painting

Saturday, June 02, 2007

Frame Interior Walls
Frame Porch
Install Appliances
Install Closet Shelving
Install Electrical
Install Floor Decking
Install Roof Shingles
Install Siding Starter Strips
Install Soffitt
Install Termite Shield, Sill Sealer, Sill Plate
Install Truss Clips
Paint Interior Trim
Spread Pea Gravel
Trim Doors

Saturday, June 09, 2007

Install Doors
Install HVAC
Install Interior Doors & Knobs
Install Porch Rail & Lattice
Install Windows
Landscaping
Prime Interior Walls
Trim Windows